HUAWEI BTS3900L PDF

Indoor model: BTS, BTSL. − Outdoor model: BTSA. ○ Distributed base station: DBS BTS BTS, the indoor macro base station. Huawei series LTE FDD base stations can be classified into indoor macro base stations (BTS and BTSL), outdoor macro base stations. Manuals and User Guides for Huawei BTSL GSM. We have 1 Huawei BTSL GSM manual available for free PDF download: Installation Manual.

Author: Kazrataxe Mogami
Country: India
Language: English (Spanish)
Genre: Music
Published (Last): 14 February 2012
Pages: 193
PDF File Size: 5.6 Mb
ePub File Size: 19.16 Mb
ISBN: 520-3-30028-680-8
Downloads: 6829
Price: Free* [*Free Regsitration Required]
Uploader: Nir

Replace the subrack if necessary. Step 4 Test the insulation between the base and the expansion bolt.

By continuing to browse the site you are agreeing to our use of cookies. Install the equipotential cable on the door. Page 6 Press the keys in turn. Installing The Monitoring Bt3900l Cables — The optical modules and fiber optic cables are of the multimode type. The figure of the GPS surge protector is for reference only. Page 77 Fiber optic cables cannot be squeezed by the cabinet door when routed through the cabinet, as shown in FigureFigure Figure Installing The Gps Surge Protector Product Versions The following table lists the product versions related to this document.

Changes In Btsl ver. That documenet is very useful with coustomer, especially with the beginner, I will tell my friend about this. Step 3 Remove the cabinet door to facilitate operations, as shown in Figure Lower the puller on the optical module.

If the resistance is greater than or equal to five megohms, you can infer that the cabinet is insulated from the floor. Checking Installed Modules And Cables The number bts300l onsite personnel depends on the engineering schedule and installation environment. All other trademarks and trade names mentioned bts3900 this document are the property of their respective holders. Step 2 Check the exterior of the packing case. Table of contents About This Document Figure shows correct and incorrect operations.

  INDESCRIBABLE CHRIS TOMLIN CHORDS PDF

Search for a nearby reseller and get direct contact information. Page Ensure that the heads of all the cable ties are outside the cabling teeth, as shown in Figure Got it, continue to print.

GSM Base Stations and Documentation

Installing The Bbu Components Installing The Bbu Bts3900 Step hhuawei Align mounting holes on the cable holders with mounting holes on both sides of the BBU case, and then use two M4 screws on each side to secure the cable holes to 1. If there are ejector levers on the panel, close them.

Reinstall the protective cover and secure it to 0. Page 67 When inserting a board into a slot, keep the board on the same plane as the slot. Small cell base station. Firewall and Application Security Gateway. Page 73 Cable clips must be vertical with cables, and the cables in a cable clip must be parallel. Checking Installed Modules And Cables Check whether the power cables are securely connected, and the screws are tightened on the cables in the cabinet by referring to Figure Table AR Series Access Routers.

Procedure Step 1 Determine the position of the cabinet by referring to the marking template, as shown in Figure Installing The Cabinet Page 57 The figure of the GPS surge protector is for reference only.

Raise the puller on the optical module.

Cable clips must be vertical with cables, and the cables in a cable clip must be parallel. You may have the following questions about macro base stations: Page 48 Mark the positions of the mounting holes on the concrete floor, as shown in Figure The transmission equipment is fed with external power supply since DCDUA does not support power supply to transmission equipment.

  BRADT MALAWI PDF

Mark the positions of the mounting holes on the concrete floor, as shown in Figure Installing A Bbu Alarm Cable Install the protective cover, and then use a screwdriver to tighten the screws.

Page 5 Examples of information displayed on the screen are in Courier New. This chapter only describes the procedure for installing components in the BBU.

Indoor Macro Base Station BTS3900

Remove the dustproof caps from the optical connectors at the end labeled 1A and 1B on the fiber optic cables, and insert the optical connectors into the optical modules in BBU 1. C cabinet, as shown Figure In a triple-mode scenario, two BBUs are configured. Before a cabinet is bts300l, you must familiar with the cabinet structure, application scenario, and space requirements.

Therefore, you must insert an fiber optic cable into an unpacked optical module within 20 minutes.

GSM Base Stations and Documentation-Wireless Network Info Community-Huawei Connect

Notice The purchased products, services bbts3900l features are stipulated by the contract made between Huawei and the customer. Page 97 Lower the puller on the optical module. Smart Modular Data Centers. C Hardware Description — Safety Information During the installation, you must familiar with the following reference document: Step 3 Lay out the cable by referring to